Commissioned in 2021, this project involved the complete production and installation of an exhibition for the Institut du Monde Arabe. The timeline was particularly demanding, with a total duration of two months, covering production, international shipping from Beirut, and on-site assembly.
Production was completed within one month, followed by installation and assembly on site. The exhibition was fully assembled in 18 days, ahead of the initial 30-day schedule, allowing the project to be delivered in advance of the opening and to the satisfaction of the client.
Designed by architect Carl Gerges.